1x1px_white Slovenski jezik English language 1x1px_white
1x1px_white INO, d.o.o., Žiri
1x1px_99 Avtomatizacija 1x1px_99 Sitotisk 1x1px_99 Tisk stekla 1x1px_99 Servis 1x1px_99 O podjetju
1x1px_transparent Home1x1px_f0Contact1x1px_f0Sitemap 1x1px_f0
1x1px_transparent
1x1px_transparent
Automation
AUTOMATION
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_transparent
1x1px_white
1x1px_white

What solutions have we provided our partners with?

1x1px_white

Simultaneous conception of a new valve and assembly line


Partner
Danfoss Trata d.o.o.
1x1px_white

Problem
Company wished to spare precious time by launching as soon as possible serial production of a new valve, which by the time was still in its design fase.
1x1px_white

Solution
They presented us the concept of a new product as well as the prototype. Relying on our experience and know-how, we were able to start conceiving the assembly line even though the new product was not yet available.
1x1px_white

Benefit
- Extremely reduced period from product conception to serial production, meaning faster sales opportunities and reduced cost refund time,

- Simplification of assembly, as a result of fruitful collaboration means reduced assembly time and lower production cost.


Simultaneous conception of inserter and assembly line


Partner
Tomplast d.o.o.
1x1px_white

Problem
Company wanted to launch serial production of inserter as soon as possible even though it was still in its conception fase.
1x1px_white

Solution
During the product conception period we launched with our partner development research for assembly line operating 6 complex functions:
  1. Automatic dosage and insertion of blowpipers
  2. Inserter placement (manual working post)
  3. Embedding blowpipers into inserter by controlled force and drive
  4. Application of sealing material by a robot
  5. Transfer of inserters to transport belt with two hours stock
  6. Packing finished products into cardboard boxes (manual working post)

1x1px_white

Benefit
- Extremely reduced period from first prototype to serial production - 4 months,

- Increased line productivity with minimal manual work of only two operators..


Conception and manufacture of testing device to examine the valve sealing


Partner
Danfoss Trata d.o.o.
1x1px_white

Problem
Company faced troubles caused by needless complaints as tests performed by their testing devices, measuring the valve sealing, were not satisfactory.
1x1px_white

Solution
Our partner's experience in valve testing with different methods helped us to choose and implement the best one into the new testing device together. Valve is now sunk into the water where efficient measurment takes place and gives more reliable results.
1x1px_white

Benefit
- Company is equipped with reliable testing device which assures detection of defective valves,

- Number of complaints is substiantialy reduced, collaboration with our partner allowed the improvement of productivity..
1x1px_white
1x1px_white
INO Assistance

Case studies

1x1px_white
1x1px_transparent 1x1px_white
1x1px_transparent
1x1px_cc
1x1px_transparent
Natisni print  |  Na vrh on top


1x1px_white
1x1px_transparent 1x1px_white 1x1px_transparent
1x1px_white
INO, d.o.o., Žiri, Industrijska ulica 14 , 4226 Žiri, Slovenia tel.: +386 4 505 11 00, fax: +386 4 505 11 12, e-mail: info@ino-ziri.si

© 2012 INO, d.o.o., Žiri, Slovenia | Privacy policy | Web site production: Uspeh, d. o. o.

Your needs How we can help? Advantages Case studies
Your needs Screenprinting machines Advantages Case studies
Your needs Glassprinting machines Advantages
INO Assistance Advantages Phone Assistance
Presentation References Competences How to find us? Contact Jobs